You must follow the installation and maintenance manuals to receive the utmost benefits/lifetime of your flooring.

Make sure you have sufficient cartons to complete the job, always add 5% designed for waste. Place the unopened packages of flooring in the center of the room 24 to 48 hours just before beginning installation. Usually do not open up cartons until you are ready to begin set up To get the best appearance and utility; we recommend you randomly blend panels from various cartons.

Color Difference between individual panels or packs are regular consideration in Organic Flooring, therefore to increase appearance it is always wise to install the flooring in natural light (laying at night is not recommended). Cork and solid wood are both products of nature. Difference in the structure, color, and patterns (also in the same carton), are component of the natural beauty of the material.

Cork or Hardwood Flooring is not ideal for damp and steamy areas.

Inspect all panels prior to installation. It is your responsibility never to install defective panels.

All End-Joints of Panels should be staggered 8" from joints of the previous row

Much like all products from nature sunlight may cause color variations.

An expansion space of at least 3/8" must be used throughout, not merely between walls and other flooring, but also around door frames, pipes, or other set objects. With a room size greater than 33'(planks laid length smart) or 26' (planks laid crossways), growth joints should be included. The structures own expansion joints must be taken in consideration. These expansion areas can be covered with baseboard and/or trim.

Subfloor Specifications

The top of subfloor must be sound and level within 1/8" within an 8-ft. radius. The subfloor should be clean and dry.

Concrete subfloors should never contain much more than 3-lbs. moisture (1.5 lbs. with radiant warmth systems) on a dry-weight basis (calcium chloride test). Moisture content of timber subfloors should be between 6-10% Wetness Content (MC).

Relative humidity range at the work site ought to be 45% - 65%; Area Temperature setting should be between 65F-80F degrees.

Job Site Evaluation

Before installing inspect the work site thoroughly. Determine if the quality, subfloor and subfloor conditions are appropriate. In homes with crawl spaces, base vents must provide cross ventilation without dead air space. Vents ought to be located through the entire foundation with opening region add up to 1 ½% of the square area within the crawl space. If excessive dampness exists within the home, you need to lay a 6-mil dark polyethylene or foam underlayment dampness barrier (available on this site on the ground in the crawl space below the installation area.

Preparation

Inspect the subfloors to ensure they are sound and level

Hardwood subfloors: Inspect the wood subfloor to determine that it is sound and level. Make any required maintenance and remove or set any protruding nails, staples or screws. Re-nail any loose areas or areas with squeaks. If the subfloor sags, inspect the joists below for twists or various other weaknesses and restoration. Sand or plane any high areas, fill any low areas. At this time, door jambs should be undercut to avoid challenging cuts. Also make sure to keep proper expansion under door jambs.

Concrete subfloors: On or below grade concrete subfloors are usually acceptable if an effective moisture barrier is definitely installed. Be sure that, as a minimum, any concrete subfloor reaches least 50-60 days old before setting up a cork/wood floor over it. Check wetness articles by taping a 2-ft. x 2-ft. square of polyethylene film to the slab in three or four locations and, if possible, place a lamp or other heat supply over the poly for 24 hours or conduct a calcium chloride check. Signs of excess moisture consist of: discolored concrete, cloudy film or actual drinking water droplets on the lower of the poly. Fill up any voids or low areas in the subfloor with a self-curing leveling compound. Make sure it is fully cured before proceeding with the cork/ wood set up. 15-lb. Roofing paper can be appropriate for leveling minor depressions in the ground. Cut to the form of the http://query.nytimes.com/search/sitesearch/?action=click&contentCollection®ion=TopBar&WT.nav=searchWidget&module=SearchSubmit&pgtype=Homepage#/Augusta Georgia despair and stack in layers to level the area.

Other subfloors: Cork/Hardwood Floors can be installed over a variety of existing floors including: vinyl sheet or tiles, rubber tiles, linoleum, terrazzo, ceramic tile, or other wood flooring. The same leveling and dampness requirements apply and the existing floor must be sound.

Prior to begin laying CORK/Real wood Flooring in a below quality installation (basements, etc.) a 1/64" (0.2mm) polyethylene film must be laid Overlap the film by 6" and seal the seams with duck tape. Also, in below quality installations wrap the film up the wall.

Begin Laying

Measure the space, this allows you to determine if the last plank in the initial row will likely be shorter that 12". If this is actually the case, the first plank in row should be shortened to increase the overall stability of the flooring.

If the beginning wall is not straight, spacers or batten ought to be used to insure the first row is right. After laying the 1st three rows these spacers can be removed (however, it is best to leave a 3/8" expansion space)

Lay the first plank in the right corner of the area with tongue-side towards the wall. Don't forget to use spacer wedges along all wall space or other fixed points in the area. Insert the finish joint of the second plank precisely into the end joint of the first plank. This purpose, it must be done at an angle of approximately 20°-30° lowering with light pressure the panel in place. Continue installing the first row.

With the next row, start with the leftover piece of plank from the previous row if the plank is at least 12" long (Note: Stagger end joints in adjunct rows by at least 8".. If not really a new plank should be cut. Always keep up with the spacing from the wall. Using the leftover plank from the initial row, starting on the proper, lower this plank in place at approximately 20°-30° angle with the main one in the first row. Lower the next plank in this row in place at the same angle. This is achieved by lifting up the front aspect of plank by around (3"-4";) - as well as previously laid plank from the same row - after that lay in place with minor pressure with the planks from the prior row. After the fitting the whole row, use a tapping block (gently) to close any where to buy Vinyl flooring Augusta GA gaps between panels. Preceded with the laying row by row.

In the event that you used spacers or batten to keep carefully the first row right, after the 3-4 row take them off, still leaving the required spacing on all walls. Make certain the spacing is held around fixed factors (wall space, door frames, etc.). The flooring must float openly.

If you cann't engage the joints of planks under door frames, kick plates, etc. and pull bar may be used. Remove all of the spacers and install all foundation boards and trims ensuring the floor can move freely underneath. Never attach base boards or trim directly to the flooring.